where is it lulSo, when working with dirt that is, I don't know... like, 80%+ sand, what is needed to produce adequate trails?
These are just for me, not for the public so just as long as I can flow through them, I will be happy.
Future site of trails:
Just a large open field. Normally water never gets to where its at, we were irrigating the orchards and filled a pond that borders it a little high, and some water went into the overflow, and into a not-so-defined overgrown ditch in that field that is supposed to direct elsewhere. So, there won't be standing water (and its all be soaked up already) during construction.